Journals →
Gornyi Zhurnal →
2011 →
#8 →
Back
Back
THEORY AND PRACTICE OF PRODUCTION | |
Physics and mechanics of mining rocks | |
ArticleName | Optimization of mining operations on the example of the Maikubensky strip mine |
ArticleAuthor | Rakishev B. R., Moldabaev S. K., Shulaeva N. A. |
ArticleAuthorData | Rakishev B. R., Head of Department, Professor, Doctor of Engineering Sciences, Member of the NAS of the Republic of Kazakhstan (K. I. Satpaev Kazakhstan National Technical University), e-mail: b.rakishev@mail.ru; Moldabaev B. R., Technical Consultant, Professor, Doctor of Engineering Sciences, e-mail: moldabaev_s_k@mail.ru, Shulaeva N. A., Director on Labour Protection and Ecology (Maikuben-West Ltd.), e-mail: fshulaeva@mail.ru |
Abstract | On the example of the Maikubensky strip mine (Kazakhstan) it is presented the developed by the authors a multi-criteria mathematical model of overburden removal optimization (minimization) and time schedule of the open-pit development by automated distribution of coal mining volumes between blocks and units of the open-pit field. |
keywords | Inclined-flat coal seams, open-pit field, units, blocks, time schedule of development, optimization of overburden removal current and average coefficients, volume sharing, mathematical model. |
Language of full-text | russian |
Full content | Buy |