Журналы →  Gornyi Zhurnal →  2011 →  №8 →  Назад

THEORY AND PRACTICE OF PRODUCTION
Physics and mechanics of mining rocks
Название Optimization of mining operations on the example of the Maikubensky strip mine
Автор Rakishev B. R., Moldabaev S. K., Shulaeva N. A.
Информация об авторе Rakishev B. R., Head of Department, Professor, Doctor of Engineering Sciences, Member of the NAS of the Republic of Kazakhstan (K. I. Satpaev Kazakhstan National Technical University), e-mail: b.rakishev@mail.ru; Moldabaev B. R., Technical Consultant, Professor, Doctor of Engineering Sciences, e-mail: moldabaev_s_k@mail.ru, Shulaeva N. A., Director on Labour Protection and Ecology (Maikuben-West Ltd.), e-mail: fshulaeva@mail.ru
Реферат

On the example of the Maikubensky strip mine (Kazakhstan) it is presented the developed by the authors a multi-criteria mathematical model of overburden removal optimization (minimization) and time schedule of the open-pit development by automated distribution of coal mining volumes between blocks and units of the open-pit field.

Ключевые слова Inclined-flat coal seams, open-pit field, units, blocks, time schedule of development, optimization of overburden removal current and average coefficients, volume sharing, mathematical model.
Language of full-text русский
Полный текст статьи Получить
Назад