TECHNICAL AND TECHNOLOGICAL ASPECTS OF DEVELOPMENT KIMBERLITE DEPOSITS | |
ArticleName | Improvement technology for the contour near bottom reserves of ore in the "Udachnyy" deep open pit |
ArticleAuthor | Akishev A. N., Babaskin S. L., Zyryanov I. V. |
ArticleAuthorData | “Yakutniproalmaz” Institute (Mirnyy, Russia): Akishev A. N., Head of Department, Candidate of Engineering Sciences, e-mail: AkishevAN@alrosa.ru Babaskin S. L., Head of Laboratory, e-mail: BabaskinSL@alrosa.ru Zyryanov I. V., Deputy Director of Scientific Work, Doctor of Engineering Sciences, e-mail: ZyrianovIN@alrosa.ru |
Abstract | During the open-pit development at “Udachnaya” kimberlite pipe, there has arisen the research necessity for the improvement technology of ore pillars, left in the lower part of pit edge. It is not possible to hold the open cast development of ore pillars in full volume and within the specified period, because of the requirement of the total reconstruction of open pit with the pit edge rebuilding (along the full height). This reconstruction leads to the necessity of removal of tens of millions m3 of waste rocks and takes not less than ten years. The underground method for the full ore pillars caving is also not suitable, because it requires the considerable volumes of mine preparation works. Such a requirement doesn’t fit in the schedule dates of underground mine construction. Moreover, it requires the considerable financial expenditure for roadheading. For this problem solving, it is suggested to divide the ore pillars into two parts: the upper part should be developed by open cast method; the lower part should be developed by underground method. During the reconstruction process, it is suggested to strip the working levels by steeply inclined transportation ramps with increased gradient (up to 250‰), for the purpose of decreasing of the open pit volume reconstruction, during the ore pillars improvement. Further, these ramps are planned to use for the lifting of pit bottom retained ore, using the hinged dump trucks, equipped with the remote control. Application of the described technology makes it possible to do the following operations: |
keywords | Deep open pit, outside open pit and under open pit reserves, open cast and underground development, transition zone, reconstruction of final edge, extraction of ore pillars, steeply inclined ramps, hinged dump trucks |
References | 1. Chaadaev A. S., Akishev A. N., Babaskin S. L. Skhema vskrytiya i otrabotki glubokikh gorizontov almaznykh karerov krutonaklonnymi vyrabotkami (Scheme of stripping and processing of deep horizons of diamond open pits by the steeply inclined excavations). Gornaya promyshlennost — Mining Industry, 2008, No. 2. |
Language of full-text | russian |
Full content | Buy |