Journals →
Gornyi Zhurnal →
2011 →
#8 →
Back
Back
ABOUT EXPERIENCE OF MINING ENTERPRISES AND ORGANIZATIONS WORKS | |
Improvement of techniques and technologies of mining works | |
ArticleName | Development and implementation of mining plants at uranium in-situ leaching facilities |
ArticleAuthor | Shemetov P. A., Glotov G. N. |
ArticleAuthorData | Shemetov P. A., Adviser of General Director, Doctor of Engineering Sciences, e-mail: info@ngmk.uz; Glotov G. N., Deputy General Director, Candidate of Engineering Sciences (Navoi Mining and Metallurgical Combinat), e-mail: gnglotov@yandex.ru |
Abstract | On the base of educed regularities the determination (causativeconsecutive), dynamical (described in time) model of uranium underground leaching, adopted (checked) as conformity to fact results of technological blocks (cells) tests. Efficiency is high (since 90%). The techniques of correction coefficients determination (adoption to different conditions) have been developed for model usage in different conditions of underground leaching (Russia, Kazakhstan, Ukraine, China and etc.). |
keywords | Plan of mining works, enterprises of underground uranium leaching, mathematical simulation, industry design, geotechnological model. |
Language of full-text | russian |
Full content | Buy |