Journals →  Gornyi Zhurnal →  2011 →  #8 →  Back

ABOUT EXPERIENCE OF MINING ENTERPRISES AND ORGANIZATIONS WORKS
Improvement of techniques and technologies of mining works
ArticleName Main directions of techniques and technologies improvement of lode deposits development in the Republic of Uzbekistan
ArticleAuthor Raimzhanov B. R., Lobanov V. S., Mukhitdinov A. T., Vakhitov R. R., Kazakov B. I.
ArticleAuthorData Raimzhanov B. R., Deputy Director of Science, Professor, Doctor of Engineering Science, e-mail: info@georang.uz, Lobanov V. S., Head of Laboratory of Mining Works, Mukhitdinov A. T., Chief Specialist of Laboratory of Mining Works, Vakhitov R. R., Engineer of Second Cathegory, Kazakov B. I., Engineer of Second Cathegory (“Ozgeotekhliti” Institute), e-mail: gorlab@yandex.ru
Abstract

Variants of modified systems of development of high-dipping lode deposits with proposed succession of ore bodies and longhole stoping of sublevel roadways on the base of usage modern mechanized scrubbed complexes and small-sized self-moving equipments have been suggested and substantiated by calculation of technical and economical parameters, as optimal systems, increasing efficient of ore extraction.

keywords Lode types of deposits, underground development, mechanized complexes, self-moving drilling devices and loading and delivery machines, single-rail complex, opening schemes, modified system of development.
References

1. Rakhimov V. R., Alimkhodzhaev S. R. Razvitie mineralno-syrevoy bazy gornodobyvayushchey promyshlennosti Uzbekistana v goristykh rayonakh (Development of mineral raw material base of mining industry of Uzbekistan in mountain regions). Gorniy zhurnal –Mining Journal. 2001. No. 10.

2. Ryabchenko E. P., Musatov I. A. Otrabotka rudnykh zalezhey nebolshoy moshchnosti s primeneniem prokhodcheskogo kompleksa KPV-1 (Development of ore sources with low capacity, usage driving complex KPV-1). Gorniy zhurnal – Mining Journal. 1975. – № 1.

3. Druzhkov V. G., Sayfutdinov Yu. N., Neshkas V. M. Ispolzovanie monorelsovykh prokhodchesko-ochistnykh kompleksov dlya razrabotki krutopadayushchikh zhil (Usage of single-rail driving scrub complexes for development of high-dipping lodes). Tsvetnaya metallurgiya – Non-ferrousmetallurgy. 1988. No. 9.

Language of full-text russian
Full content Buy
Back