Journals →  Eurasian mining →  2024 →  #1 →  Back

SATBAYEV UNIVERSITY
ArticleName Patterns of development of geomechanical processes during hybrid open pit/underground mineral mining
DOI 10.17580/em.2024.01.02
ArticleAuthor Nurpeisova M. B., Salkynov A. T., Soltabayeva S. T., Miletenko N. A.
ArticleAuthorData

Satbayev University, Almaty, Kazakhstan

Nurpeisova M. B., Professor, Doctor of Engineering Sciences, marzhan-nurpeisova@rambler.ru
Soltabayeva S. T., Professor, Candidate of Engineering Sciences

 

NPK Algorithm LLP, Karaganda, Kazakhstan

Salkynov A. T., Chief Executive Officer

 

Research Institute of Comprehensive Exploitation of Mineral Resources — IPKON, Moscow, Russia
Miletenko N. A., Senior Researcher, Candidate of Engineering Sciences

Abstract

This article deals with the determination and analysis of patterns of geomechanical processes in hybrid open pit/underground mineral mining. The domestic and foreign practices of mineral mining gravitate increasingly more toward the hybrid open pit/underground technologies. An illustration of such operations in Kazakhstan is the Saryoba copper–gold ore deposit which needs individual engineering solutions and reliable geomechanical justification of production with regard to the standards of subsoil protection and industrial safety. Hybrid open pit/underground mining creates a complex geomechanical system featuring repeated loading of the same rock mass areas during open pit and underground mining operations implemented concurrently or sequentially. The problem of geomechanical assessment of rock mass in such conditions is complicated by many internal and external influences, and by variability of rock mass behavior in time and space. Aiming at safe and efficient mining of gold ore lodes at the test deposit, the authors analyze the influence of natural and geotechnical factors on deformation processes, which enables estimating controllability of these effects on rock mass and its surroundings. This article describes the studies accomplished by the authors in the course of the research in the framework of the Project on Integrated Monitoring of Slow Crustal Motions in Central Kazakhstan. Furthermore, the article contains the geomechanical monitoring results obtained by the authors using up-to-date survey and geodesy equipment which ensures high accuracy and efficiency of surveying. The novelty of the research consists in evolvement of a concept about deformation mechanism in bedded rock masses and fracturing of a pillar established between the open pit and underground mine, as well as in determination of displacement patterns in rocks mass subjected to the hybrid open pit/underground method of mineral mining, which enables selecting ways of control over geomechanical processes.

The study was supported by the Ministry and Science and Higher Education, Grant АР14871828 Investigation and Development of High-Efficient Procedure for Geotechnical Monitoring of Rock Masses for Assessment and Prediction of Deformation Processes during Mineral Mining.

keywords Mineral mining, rocks, geomechanical processes, monitoring, methods, patterns
References

1. Nedlands W. A. Controlling Seismic Risk. Sixth International Symposium on Rockburst and Seismicity in Mines Proceedings. Australia : Australian Centre for Geomechanics, 2005.
2. Owen M. L. Calibrating a semi-quantitative seismic risk model using rockburst case studies from underground metalliferous mines. Controlling Seismic Risk : Sixth International Symposium on Rockburst and Seismicity in Mines Proceedings. Australia: Australian Centre for Geomechanics, 2005. pp. 191–204.
3. Trubetskoy K. N., Kaplunov D. R., Rylnikova M. V. Development of resourcesaving and resource-reproductive technologies of integrated mineral mining. Moscow : IPKON RAN, 2012. 206 p.
4. Sashurin A. D., Panzhin A. A. Organization of geodynamic monitoring at open pit mines of Kachanar GOK. Problems of Subsoil Use. 2015. No. 1. pp. 45–53.
5. Utegulov B., Utegulov A., Begentayev M., Begentayev B., Uakhitova A. et al. Method for determining the insulation in asymmetric networks with voltage up to 1000 V in mining enterprises. Proceedings of the IASTED International Conference on Power and Energy Systems and Applications, PESA. 2011. pp. 54–57.
6. Kenzhina I. E., Kozlovskiy A. L., Chikhray Y. et al. Study of gas swelling processes under irradiation with protons and He2+ ions in Li4SiO4–Li2TiO3 ceramics. Crystals. 2023. Vol. 13, Iss. 10. ID 1526.
7. Sashurin A. D., Panzhin A. A., Kharisov T. F. Role of geodynamic movements in water breakthroughs into workings at exploration under difficult hydrogeological conditions. Bulletin of the Tomsk Polytechnic University. Geo Аssets Engineering. 2021. Vol. 332, No 6. pp. 28–38.
8. Вaibatsha A. B., Bekbotaeva A. A., Bekbotayev A. T. Ore minerals of Carboniferous copper sediment-hosted Zhezkazgan deposit (Central Kazakhstan). 15th International Multidisciplinary Scientific GeoConference SGEM 2015. Albena, Bulgary. 2015. pp. 329–337.
9. Shults R., Soltabayeva S., Seitkazina G., Nukarbekova Z., Kucherenko O. Geospatial monitoring and structural mechanics models : A case study of sports structures. Environmental Engineering. International Conference on Environmental Engineering. 2020. DOI: 10.3846/enviro.2020.685
10. Bekbassarov Sh., Soltabaeva S., Daurenbekova A., Ormanbekova A. “Green” economy in mining. New Developments in Mining Engineering 2015: Theoretical and Practical Solutions of Mineral Resources Mining. London : CRC Press, 2015. pp. 431–434.
11. Salkynov А., Rymkulova А., Suimbayeva А., Zeitinov Sh. Research into deformation processes in the rock mass surrounding the stoping face when mining sloping ore deposits. Mining of Mineral Deposit. 2023. Vol. 17, Iss. 2. pp. 82–90.
12. Miletenko N. A., Mitishova N. A., Nurpeisova M. B., Aitkazinova Sh. K. Geomechanical approach to prediction of hazardous hydrogeological processes in hybrid open pit/underground mineral mining. Mine Surveying Bulletin. 2014. No. 4. pp. 55–57.
13. Nurpeisova M., Rysbekov K., Aitkazinova Sh. et al. Ground permanent geodetic point for forced centering of instruments. Patent of the Republic of Kazakhstan. Patent RK. No. 35798. Published: 11.03.2021.
14. Motovilov I. Y., Telkov S. A., Barmenshinova M. B., Nurmanova A. N. Examination of the preliminary gravity dressing influence on the Shalkiya deposit complex ore. Non-Ferrous Metals. 2019. No. 2. pp. 3–8.

15. Kassymkanova K. K., Rysbekov K. B., Nurpeissova M. B. et al. Geophysical studies of rock distortion in mining operations in complex geological conditions. International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences. 2023. Vol. XLVIII-5/W2-2023. pp. 57–62.
16. Nurpeisova M. B., Rysbekov K. B., Kyrgizbaeva G. M. Innovative methods for conducting integrated monitoring at geodynamic test sites : Monograph. Almaty : KazNITU, 2015. 266 p.
17. Iofis M. A., Maltseva I. A. Rock mass displacements in hybrid open pit/underground mining of primary diamond deposits. Mine Surveying Bulletin. 2002. No. 2. pp. 29–31.
18. Iophis M. A., Odintsev V. N., Blokhin D. I., Sheinin V. I. Experimental investigation of spatial periodicity of induced deformations in a rock mass. Journal of Mining Science. 2007. Vol. 43, No. 2. pp. 125–131.
19. Batugin A., Odintsev V., Kolikov K., Lijiang Yu., Khotchenkov E. Displacement and mine seismicity processes during undermining of a tectonically active fault area at the Sinvay deposit. 18th International Multidisciplinary Scientific GeoConference SGEM 2018. Conference proceedings. 2018. Vol. 18, Iss. 1.3. pp. 319–326.
20. Kuldeev E. I., Rysbekov K. B., Donenbayeva N. S., Milеtenko N. A. Modern methods of geotechnics — Effective way of providing indus trial safety in mines. Eurasian Mining. 2021. No. 2. pp. 61–66.
21. Nurpeisova М. B., Abenov A. M., Milеtenko N. A., Dosetova G. Zh. Highly efficient monitoring procedure for deformation prediction in copper ore mining. Eurasian Mining. 2023. No. 1. pp. 19–24.

Full content Patterns of development of geomechanical processes during hybrid open pit/underground mineral mining
Back