Journals →  Gornyi Zhurnal →  2022 →  #1 →  Back

APPLIED RESEARCHES
ArticleName Cut-off grade determination at Shiraldzhin gold deposit by the analogy method of geotechnical engineering
DOI 10.17580/gzh.2022.01.20
ArticleAuthor Dzhumanbaev V. V., Kurmanaliev K. Z., Mansurov V. A., Mezhelovsky V. I.
ArticleAuthorData

Global Asia Management, Almaty, Kazakhstan:

V. V. Dzhumanbaev, President of the Board

 

Vertex Gold Company, Bishkek, Kyrgyzstan:
K. Z. Kurmanaliev, Mining Engineer–Geologist, usako@mail.ru
V. A. Mansurov, Geotechnical Advisor

 

Global Shiraldzhin Mining, Bishkek, Kyrgyzstan:
V. I. Mezhelovsky, CEO

Abstract

Shiraldzhin deposit is a genetic and commercial analog of actual Dzhamgyr mining project. Exploration and operation in both cases are implemented within the unified engineering and management package. The largest and best explored ore occurrence at Shiraldzhin is Sterzhnevoe ore body traceable to 1200 and 350 m along the strike and dip, respectively. The ore body is 0.2 to 13 m thick (average thickness 2.89 m), has the western dip and occurs at the angle of 30–70°. Down to the Level of +2650 m, the proven reserves are appraised as 1795.7 kt of ore and 5985.5 kg of gold at gold content of 3 g/t. For the preliminary risk assessment of Shiraldzhin gold mining in Kyrgyzstan, the analogy method is used, including geotechnical stability parameters of enclosing rock mass and ore body, and correlation of expenses connected with preparatory works, stone drivage and stoping. The correlation factor is determined from the difference of geotechnical parameters of rock masses and ore bodies at the deposits. Considering the global market price of gold and with regard to the operating costs, the cut-off grade is determined for gold-bearing blocks. It is mentioned that the main investment risk of Dzhamgyr and Shiraldzhin gold projects is conditioned by complex geotechnical conditions of mining at intolerable loss and dilution in case of shrinkage stoping. It is required to undertake a test survey to estimate feasibility of more effective accessing and extraction flow charts, in particular, completely mechanized breast stoping and open pit mining.

keywords Shiraldzhin deposit, geotechnical parameters, risks, losses, dilution, stoping systems, cut-off grade for gold ore
References

1. Batugina N. S., Tkach S. M., Khoyutanov E. A. Assessment of computational accuracy of minimum commercial value for gold placers. Gornyi Zhurnal. 2020. No. 12. pp. 45–48. DOI: 10.17580/gzh.2020.12.09
2. Radule Tosovic. Economic Evaluation of Small Deposits in the Applicable Function of Business Decision in Mineral Economy. International Journal of Business and Management Invention. 2017. Vol. 6, Iss. 9. pp. 59–63.
3. Abaturova I., Savintsev I., Storozhenko L., Borisikhina O. Ensuring Stable Functioning of the Geotechnical System of Mineral Deposits in Difficult Engineering-Geological Conditions. Engineering and Mining Geophysics 2019 : Proceedings of the 15th Conference and Exhibition. Gelendzhik, 2019. Vol. 2019. DOI: 10.3997/2214-4609.201901733
4. Barton N., Lien R., Lunde J. Engineering classification of rock masses for the design of tunnel support. Rock Mechanics. 1974. Vol. 6(4). pp. 183–236.
5. Eremenko V. A., Aynbinder I. I., Patskevich P. G., Babkin E. A. Assessment of the state of rocks in underground mines at the Polar Division of Norilsk Nickel. GIAB. 2017. No. 1. pp. 5–17.
6. Ignatiev S. A., Sudarikov А. Е., Imashev А. Zh. Determination of the stress-strain state of rock mass and zone of inelastic deformation around underground mine excavation using modern methods of numerical modelling. Journal of Sustainable Mining. 2021. Vol. 20, Iss. 3. pp. 220–227.
7. Laubscher D. H. A geomechanics classification system for the rating of rock mass in mine design. Journal of the South African Institute of Mining and Metallurgy. 1990. Vol. 90, No. 10. pp. 257–273.
8. Melnikov R. V. The finite element method in geotechnical engineering : Teaching aid. Moscow : Infra-Inzheneriya, 2021. 188 p.
9. Olkhovatenko V. E., Pryanishnikov E. G. Physical and mechanical properties of rocks at gold deposits in Russia’s Far East and pit wall slope stability. Tomsk : Izdatelstvo TGASU, 2020. 156 p.
10. Małkowski Р., Niedbalski Z. A comprehensive geomechanical method for the assessment of rockburst hazards in underground mining. International Journal of Mining Science and Technology. 2020. Vol. 30, Iss. 3. pp. 345–355.
11. Polovov B. D., Volkov M. N., Prishchepa D. V. Geotechnical monitoring of mining facilities in the system for assessing and ensuring the quality of geomechanical solutions. Izvestiya Uralskogo gosudarstvennogo gornogo universiteta. 2020. No. 2(58). pp. 139–160.
12. Lyutyagin D. V., Zabaykin Yu. V., Seyfullaev B. M. Issue of methodological support of geological and economic evaluation of mineral deposits in Russia. Ekonomika: vchera, segodnya, zavtra. 2019. Vol. 9, No. 9-2. pp. 483–495.
13. Sokolov I. V., Smirnov A. A., Antipin Yu. G., Nikitin I. V. Methodology for selecting geotechnology for transition zones in hybrid mining. Gornyi Zhurnal. 2018. No. 1. pp. 22–26. DOI: 10.17580/gzh.2018.01.03

Language of full-text russian
Full content Buy
Back