Журналы →  Chernye Metally →  2018 →  №7 →  Назад

Rolling and other metal forming processes
New developments of EVRAZ NTMK
Название Experience of production of crane rails from K76F steel at “EVRAZ NTMK” JSC
Автор A. A. Grats, V. V. Sviridenko, R. A. Litvinov
Информация об авторе

Nizhniy Tagil Iron and Steel Works — “EVRAZ NTMK” JSC (Nizhniy Tagil, Russia):

A. A. Grats, Head of Rail and Beam Shop
V. V. Sviridenko, Chief Roll Designer, e-mail: valery.sviridenko@evraz.com
R. A. Litvinov, Head of Technological Dept., Roll and Beam Shop

Реферат

The measured directed on development and mastering of crane rails at EVRAZ NTMK are described. The conducted investigations were finalized in selection of the cooling procedure including counter-bending of rails by a drag-over transfer mechanisms with bend deflection not less than 400 mm per rail base; rails are cooled laying on their side. Then rails are transferred from the central cooling bed to the final processing area for processing of their edges. Construction of crane rails according to the requirements of GOST R 53866-2010 means slightly more thickened rail web and substantially strengthened and smooth transition from rail web to rail head. This essential difference does not allow to manufacture crane rails in accordance with GOST 4121-96 and GOST R 53866-2010 using the same equipment. Thereby purchase and preparation of additional equipment will be required. It will include the rolls of roughing, intermediate pre-finishing and finishing stands with total mass 132 tons and total cost about 14.5 mln. roubles for each shape and dimension type.

Ключевые слова Crane rails, rolled material, hardness, counter-bending, cooling, rolling stands, properties, technology
Библиографический список

1. Saburov V. F. Performance properties of crane rails. Vestnik Yuzhno-Uralskogo gosudarstvennogo universiteta. Seriya «Stroitelstvo i arkhitektura». 2007. No. 14 (86). pp. 31–37.
2. Sveykovski U., Nertsak T. Rails production using cartridge stands and modern cooling technologies. Chernye metally. 2008. No. 1. pp. 32–37.
3. Hogg J., Giacomini L. Right on track. High-precision equipment for longer rails. Metals Magazine. 2012. No. 1. pp. 54–56.
4. Adno Yu. L. Rails for all railroad lines. Metally Evrazii. 2013. No. 3. pp. 14–15.
5. Gromov V. E. Current issues of rail production. Novokuznetsk: SibGIU, 2011. p. 260.
6. Stakanchikov V. V., Litvinov R. A. Results of technical modernization of JSC EVRAZ NTMK rail and beam shop. Proceedings on the base of Rail Commission (RC-2012) materials. pp. 88–95.
7. Litvinov R. A., Stakanchikov V. V., Uskov А. А. Current state and prospects for development of rails technology production in JSC EVRAZ NTMK. Molodoy ucheny. 2014. No. 20 (79). pp. 162–167.
8. Litvinov R. A. Rails production in JSC EVRAZ NTMK. Put i putevoe khozyajstvo. 2017. No. 2. p. 9.
9. GOST R 53866-2010. «Crane rails. Specifications». Moscow: Standartinform, 2011. p. 14.
10. GOST 4121-96. «Crane rails. Specifications». Moscow: IPK Izdatelstvo standartov, 1996. p. 6.
11. GOST R 51685-2013 «Railway rails. General specifications». Moscow: Standartinform, 2014.
12. Grats А. А., Sviridenko V. V., Litvinov R.A. Experience of crane rails production in JSC EVRAZ NTMK. Proceedings of XI International Congress of Rolling Technologies. 2017. pp. 156–160.

Language of full-text русский
Полный текст статьи Получить
Назад