Журналы →  Gornyi Zhurnal →  2014 →  №8 →  Назад

BELGOROD REGION — THE FOREFRONT OF THE IRON INDUSTRY IN RUSSIA
Название “Kombinat “KMAruda“ JSC: results and development prospects
Автор Tomaev V. K.
Информация об авторе

Author:

Name & Surname: Tomaev V. K.

Company: KMAruda Integrated Plant JSC (Gubkin, Russia)

Work Position: Managing Director

Contacts: e-mail: Tomaev@kmaruda.ru

Реферат

The plant has experienced substantial technical upgrading and production reorganization in recent years. The structure of the plant is added with a new subdivision—backfill workshop (BW). At present backfilling uses 100% of the current tailings. This enables waste-free ferrous quartzite mining and iron-ore concentrate production. At the same time, the closed-circuit water supply has been actualized, which allows elimination of outside-source process water in amount of 30 Mm3 per year. The critical strategic objective of the plant is to uncover and develop a new mining level in Gubkin’s Mine. Design capacity of the new mining level is 7 Mt crude ore yearly. It is scheduled to reach the design capacity in 2023. Socially, the plant builds up and consolidates traditions of a sound town-forming enterprise. An important undertaking is the conclusion of the Collective Agreement between the employers and employees. Before entering the Collective Agreement, co-workers discuss it in the production units and analyze the performance of the previous agreement.

Ключевые слова KMAruda Integrated Plant JSC, ferrous quartzite, tailings, backfilling system, social policy
Библиографический список

1. Tomaev V. K. Kombinatu «KMAruda» – 60 let: itogi i perspektivy razvitiya (The 60-th anniversary of JSC “Kombinat KMAruda” : conclusions and development prospects). Gornyi Zhurnal = Mining Journal. 2013. No. 4. pp. 41–45.

Language of full-text русский
Полный текст статьи Получить
Назад