FROM THE OPERATIONAL EXPERIENCE OF THE MINING COMPANIES AND THE ORGANIZATION | |
UCHALINSKY MINING AND PROCESSING INTEGRATED WORKS OJSC | |
ArticleName | Extraction of bottom and sidewall ore reserves of the open-pit mine from the dividing pillar in the Molodezhny deposit |
ArticleAuthor | Akhmetov A. A., Akmurzin R. K., Zagretdinov A. N., Tankov M. S., Dik Yu. A. |
ArticleAuthorData | Uchalinsky Mining and Processing Integrated Works JSC (Uchaly, Russia): Akhmetov A. A., Head of Production and Technical Department, e-mail: gg_akhmetov_aa@ugok.ru
Uralmekhanobr JSC (Ekaterinburg, Russia): |
Abstract | Under conditions of significant reduction of ore-containing fields, maintenance of planned annual ore output required to extract ore from a dividing ore pillar. Under order of technical management of the Uchalinsky Mining and Processing Integrated Works JSC, specialists of the Department for Mining Science of the Uralmekhanobr JSC developed “Guidelines on Mining Sequence and Geotechnology on Sublevel 240/270m in the Dividing Ore Pillar in the Molodezhny Deposit.” It was decided to withdraw mining with caving due to high quality of ore and to carry out extraction of ore reserves in the dividing pillar, both in the bottom and sidewall of the open-pit mine, by room-and-pillar mining using solidifying backfill. |
keywords | Open-pit mine, underground mine, dividing pillar, bottom and sidewall reserves, room-and-pillar mining with backfilling, undermined wall protection, pilot sites |
References | 1. Rekomendatsii po poryadku i tekhnologii otrabotki razdelitelnogo rudnogo tselika Molodezhnogo mestorozhdeniya v podetazhe 240/270 m (Recommendations on order and technology of processing of separating ore pillar of Molodezhnoe deposit in 240/270 m sublevel). Ekaterinburg : «Uralmekhanobr» JSC, 2010. |
Full content | Extraction of bottom and sidewall ore reserves of the open-pit mine from the dividing pillar in the Molodezhny deposit |