Journals →  Eurasian mining →  2014 →  #1 →  Back

FROM THE OPERATIONAL EXPERIENCE OF THE MINING COMPANIES AND THE ORGANIZATIONS
INSTITUTE OF MINING OF FAR EASTERN BRANCH OF RUSSIAN ACADEMY OF SCIENCES
ArticleName Improvement of safety of development of bump hazardous vein deposits of Eastern Primorye
ArticleAuthor Potapchuk M. I., Kursakin G. А., Sidlyar A. V.
ArticleAuthorData

Institute of Mining of Far Eastern Branch of Russian Academy of Sciences:

Potapchuk M. I., Researcher, Candidate of Engineering Sciences, e-mail: potapchuk-igd@rambler.ru

Kursakin G. А., Chief Researcher, Doctor of Engineering Sciences, e-mail: rasskazov@igd.khv.ru

Sidlyar A. V., Junior Researcher, e-mail: kaspar_89@mail.ru

Abstract

Vein deposits are developed in complex mining and geological and geomechanical conditions by underground mines of Eastern Primorye, which are included in the special group. Increasing of mining operations depth and various natural and anthropogenic factors (changing elements of ore bodies occurrence and properties of lithology complex) make a significant influence on the stress of rock massif and formation of bump hazardous areas in the time of processing. Research of stress-strain state of developed rock massifs of Yuzhnoye and Zabytoye deposits were carried out with application of numerical modeling by method of final elements. The defined peculiarities of formation of anthropogenic field of stresses in the elements, applied on development system deposits, according to the development of purifying operations, made it possible to single out the potentially bump hazardous areas. The stress grade in selvedge of massif of two upper sublevels and interchamber pillars grows considerably on final stages of stope processing due to the application of combined development system on Yuzhnoye deposit. Floor pillars belong to the potentially bump hazardous elements of development system with shrinkage of ore, applied on the Zabytoye deposit. Application of introduced and substantiated parameters of efficient measures will provide the improvement of safety of mining operations on deep horizons of deposits.

Research was performed within the framework of the program «42P «Far East» (integration project № 12-II-SU-08-10 and a youth project № 14-III-V-08-040).

keywords Vein deposits, rock bumps, development systems, geomechanical estimation, stress-strain state, method of final elements, rocks, antibump measures
References

1. Doroshenko V. I. On the problem of rock bursts at Yuzhnoye. A. V. Antipov, Yu. Yu. Pilenkov. Mining Journal. 1994. No. 3. pp. 56–61.
2. Rasskazov I. Yu. Methods for monitoring and control of rock pres sure in the mines of "MGK" Dalpolimetall". Yu. Rasskazov. G. A. Kursakin, A. M. Freidin et al. Journal of Mining. — 2006. No. 4. pp. 35–38.
3. Rasskazov I. Yu. Control and management of rock pressure in the mines of the Far Eastern region of Russia. I. Yu. Rasskazov. — Moscow: Publishing House of the "Gornaya Kniga", 2008. — 329 p.
4. Present-day geodynamics Asia: map, mapping principles, geodynamic analysis. Levi K. G. et al. Geotectonics. — Moscow, 2009. pp. 78–93.
5. Field experiment on modelling plate motions. V. Yu. Timofeev et al. Problematic issues of present-day geodynamics and seismicity of the Far East of Russia and Eastern Siberia. — Khabarovsk, 2010. — pp. 61–65.
6. Rasskazov I. Yu. Geomechanical assessment of mining conditions at Yuzhnoye deposit deep horizons. I. Yu. Rasskazov, G. A. Kursakin, M. I. Potapchuk et al. Physical and technical challenges of mining. 2012. No. 5. pp. 125–134.
7. Rock mass bump hazard management by camouflet blasting relief holes. V. A. Redkin et al. Journal of Mining. 1984. No. 5. pp. 51–54.
8. Safety rules of excavating activities in mines and at nonmetallic deposits, at mine underground construction sites, that are hazardous and prone to rock bursts (RD 06-329-99). Team of authors. — M.: SE STC on Industrial Safety of Gosgortechnadzor of Russia, 2000. — 66 p.

Language of full-text english
Full content Buy
Back