DEVELOPMENT OF DEPOSITS | |
ArticleName | Improvement of parameters of drilling and blasting operations in deep open pits with cyclical and continuous method of ore extraction |
ArticleAuthor | Rakhimov V. R., Pyankov A. G., Shemetov P. A., Petrosov Yu. E. |
ArticleAuthorData | Tashkent State Technical University (Tashkent, Republic of Uzbekistan): Rakhimov V. R., Head of a Chair, Academician of Academy of Sciences of Republic of Uzbekistan, phone: +998 (71) 246-54-51 Pyankov A. G., Senior Researcher Petrosov Yu. E., Head of a Chair
State Enterprise «Navoi Mining and Metallurgical Combine» (Navoi, Republic of Uzbekistan): Shemetov P. A., Doctor of Engineering Sciences |
Abstract | An integral assessment of technical and economic indices of «open-ended» technology of the whole cycle of final marketable products manufacturing (subject to the influence of each technological conversion on the others) is an urgent task in the following conditions: exhausting of reserves of rich ores with development depth; more significant involving of poor and off-balance ores and anthropogenic splashes into extraction and processing; complex usage of mineral raw material resources. Researches and analysis of energy intensity of the basic stages of mining production and preparation of ore mass to concentration were carried out by the joint collaboration of scientists of Tashkent State Technical University and specialists of largest Uzbekistan open pits (Muruntau gold ore open pit and Kalmakir copper ore open pit). According to results of these researches, the numerical values of power inputs were stated in terms of developed rock strength and average size of blasted ore mass in Muruntau open pit. The basic conclusion of researches became the substantiation of technological and economic feasibility of redistribution of energy consumptions by intensification of drilling and blasting crushing of durable rock massifs. A new technology of intensive drilling and blasting crushing of ore mass is developed, proposed and directed on obtaining of average size of parts of broken ore mass, optimal for following conversions of mining production and ore mass processing. |
keywords | High-capacity ore deposits, deep open pit, cyclical and continuous technology, power inputs, intensification of drilling and blasting crushing, optimal coarseness, construction of charges, plugboard chart, unit discharge, straitened media, decreasing of power intensity of ore preparation |
References | 1. Malgin O. K., Kustov A. N., Shemetov P. A. Sovershenstvovanie vzryvnykh rabot v Navoiyskom Gorno-metallurgicheskom Kombinate (Improvement of blasting operations at Navoi Mining and Metallurgical Combine). Gornyy vestnik Uzbekistana — Mining Bulletin of Uzbekistan, 2002, No. 3. |
Language of full-text | russian |
Full content | Buy |