Название Monitoring and assessment of stability of the northern pitwall in the Kalmakyr open pit mine using surveying and geodesy technologies
Автор Rakhimov V. R., Mingbaev D. I.
Информация об авторе

Tashkent State Technical University (Tashkent, Uzbekistan):

Rakhimov V. R., Candidate of Engineering Sciences, Academician of the Uzbekistan Academy of Sciences, e-mail: Rakhimov V. R.1, Candidate of Engineering Sciences, Academician of the Uzbekistan Academy of Sciences, e-mail: vrakhimov@yandex.ru

Mingbaev D. I., Senior Docent

Реферат

Geomechanical monitoring of the Kalmakyr copper–porphyritic pitwall rock mass, consisting in surveying and geodetic measurements along three profile lines, has been carried out. Based on accuracy criteria, horizontal displacements were measured using modern geodetic electron–optical instruments and satellite technologies, and vertical displacements were determined by geometrical third-order leveling. The monitoring established the fact of neo-tectonic movement and specified displacement parameters. The horizontal displacements are 18–26 mm at average velocity of 0.25 mm/day; the vertical displacements reach 54–73 mm at average velocity of 0.8 mm/day. These data bear evidence of sufficiently high-rate tectonic movement. Based on the obtained results, stability of the Kalmakyr pitwalls is to be re-estimated considering neotectonic and modern geodynamic activity. The authors also emphasize that the existing horizontal–altimetric survey network needs modernization in pursuance of current standards, as well as new detailed examination of the pitwall rock mass is required, including surveying and geodesy measurements along new profile lines, and combination of geophysical and directional survey. The research data aggregate will allow complete idea on the actual geomechanical and geodynamic processes running on the surface and deep in rock mass.

Ключевые слова Copper–porphyritic open pit mine, faults, landslides, strains, geodynamic processes, tectonic movements, block structure, mining-induced factors, measurement of displacements of control survey points, stability factor, observation procedures, survey control
Библиографический список

1. Rukovodyashchiy tekhnicheskiy material po primeneniyu geodezicheskikh sputnikovykh priemnikov pri sozdanii i rekonstruktsii setey sgushcheniya (GKKINP-01-014-98) (Guiding engineering material for application of geodesic satellite receivers during the creation and reconstruction of fine grids (GKKINP-01-014-98)). Tashkent : Uzgeodezkadastr, 1998.
2. Rakhimov V. R. Murzaykin I. Ya. Opredelenie neotektonicheskikh podvizhek skalnykh blokov geodezicheskimi sposobami (na primere Toktogulskoy GES) (Definition of neotectonic movements of rock parts by geodesic methods (by the example of Toktogul hydroelectric power station)). Gornyy vestnik Uzbekistana – Mining Bulletin of Uzbekistan, 2006, No. 2.
3. Bykovtsev A. S., Prokhorenko G. A., Sytenkov V. N. Modelirovanie geodinamicheskikh i seysmicheskikh protsessov pri razrabotke mestorozhdeniy poleznykh iskopaemykh (Modeling of geodynamic and seismic processes during the development of mineral deposits). Tashkent : «Fan» Publishing House of Academy of Sciences of Republic of Uzbekistan, 2000.
4. Inzhenernyy metod otsenki ustoychivosti severnogo borta karera «Kalmakyr» (Engineering method of estimation of steadiness of nothern edge of «Kalmakyr» open pit). Vestnik Tashkentskogo Gosudarstvennogo Tekhnicheskogo Universiteta – Bulletin of Tashkent State Technical University, 2012, No. 2.