Exploration of Stoilenskiy quarry has been connected with necessity of organization ramified dehydrating system. It includes underground drainage complex and inside-quarry drainage workings. The structure of dehydrating system, equipment, volume of drained water, principles of its usage have been presented. The prospects of dehydrating system development, taken into account quarry widening, have been shown.