Журналы →  Gornyi Zhurnal →  2010 →  №7 →  Назад

DEVELOPMENT OF DEPOSITST
Название Substantiation of optimal construction of development systems with destruction and edge ore output
Автор Vol'fson P. M.
Реферат

Advantages of dual-side edge ore output from blocks in development system with sub-story destruction of vertical layers. Proposed construction of edge output provides cutting of losses and impoverishment of beated ore mass, specific volume of tapped works, improvement of ventilation conditions of loading delivery workings.

Ключевые слова Development systems with destruction, edge output, ellipsoid of scrubbing, height of sub-story, thickness of layer, loading delivery workings, dual-side square output, losses, impoverishment
Language of full-text русский
Полный текст статьи Получить
Назад