Журналы →  Eurasian mining →  2025 →  №2 →  Назад

DEVELOPMENT OF DEPOSITS
Название Physical geotechnology and geotechnical engineering toward originative subsoil use in controllable underground mining
DOI 10.17580/em.2025.02.12
Автор Bitimbayev M. Zh., Kunayev M. S., Fedotenko N. A.
Информация об авторе

National Engineering Academy, Almaty, Kazakhstan

Bitimbayev M. Zh., Professor, Academician, Doctor of Engineering Sciences, mbitimbayev@mail.ru

 

Caspian Services Inc. JSC, Almaty, Kazakhstan

Kunayev M. S., Academician, Doctor of Geological and Mineralogical Sciences

 

Academician Melnikov Institute of Comprehensive Exploitation of Mineral Resources–IPKON, Russian Academy of Sciences, Moscow, Russia

Fedotenko N. A., Senior Researcher, Candidate of Engineering Sciences

Реферат

The history of the Earth’s subsoil use associated with extraction of minerals was created by the development of mining, which is reasonably based on the accumulation and generalization of knowledge, i.e., on the advancement of mining sciences. The diversity of mining sciences is generated depending on the conditions of formation of the geological environment, which must be met by a mining technology aimed at the anthropogenic transformation of the subsoil. Mining technologies come from physical geotechnology and geotechnical engineering for the humanity to provide itself with mineral raw materials, which means extraction of minerals with structural alteration of the subsoil through its disintegration (destruction). The methods of physical geotechnologies and geotechnical engineering, in their practical implementation, must be scientifically transformed in accordance with the needs of increasing and improving the quantitative and qualitative indicators of production. The article presents process designs that form a new framework of the physical geotechnologies and geotechnical engineering for the controllable originative subsoil development in the mode of resource reproduction, resource saving and preservation of high-quality natural environment.

Ключевые слова Physical geotechnologies and geotechnical engineering, originative subsoil use, mining systems, overhand mining, level stopes, thixotropic backfill
Библиографический список

1. Trubetskoy K. N., Miletenko N. А. The adverse effects of industrial activities during development of natural resources and possible ways of their reduction. Mine Surveying and Subsurface Use. 2013. No. 1(63). pp. 68–69.
2. Troubetskoy K. N., Panfilov E. I. Improvement of methodological bases for estimation and account of losses in solID mineral resources during deposit development (pilot scheme). Mine Surveying and Subsurface Use. 2015. No. 4(78). pp. 3–13.
3. Trubetskoi K. N., Chaplygin N. N., Kaplunov D. R. et al. Mining Sciences. Development and Conservation of Mineral Resources of the Earth. Moscow : Akademiya gornyh nauk, 1997. 478 p.
4. Troubetskoy K. N., Galchenko Yu. P. Nature-Like Technology of Integrated Subsoil Use : Problems and Prospects. Moscow : Nauchtehlitizdat, 2020. 367 p.
5. Galchenko Yu. P. Natural-and-technical system of ore mining using convergent geotechnolgy. Problems and Prospects of Integrated Subsoil Development and Preservation : V International Conference Proceedings of Academician K. N. Trubetskoy School. Moscow : IPKON RAN, 2022. pp. 24–27.
6. Bitimbayev M. Zh., Kunayev M. S., Aben E. Kh., Atkhmetkanov D. K. Integrated Subsoil Use and Preservation of High-Quality Natural Environment. A Framework for the Sustainable Social Development : Monograph. Almaty : Satbayev University, 2023. pp. 161–172
7. Trubetskoy K. N. Problems and development prospects in the mining science. Mine Surveying and Subsurface Use. 2011. No. 2(52). pp. 9–12.
8. Bitimbayev M. Zh. New variants of ore mining with shrinkage: Drastic improvement of production performance. Gornyy zhurnal Kazakhstana. 2019. No. 7. pp. 8–14.
9. Akhmetkanov D. K., Bitimbayev M. Zh., Lozynskyi V., Rysbekov K. B., Amralinova B. B. New variants for wide orebodies high-capacity mining systems with controlled and continuous in-line stoping. NEWS of National Academy of Sciences of the Republic of Kazakhstan. 2023. No. 3(459). pp. 6–21.
10. Atrushkevich A. V., Bochkareva T. N., Zaburdyayev V. S. et al. Mining. Glossary. 5th revised and enlarged edition. Moscow : Gornaya kniga, 2016. 635 p.
11. Kaplunov D. R., Rylnikova M. V. Design and realization principles of full-cycle comprehensive mining of ore deposits. MIAB. 2013. No. S27. pp. 3–11.
12. Sekisov G. V., Cheban A. Y. Low-waste mining technology for structurally complex deposits with mixed-type process flows of ore extraction and processing. Journal of Mining Science. 2021. Vol. 57, No. 6. pp. 978–985.
13. Bitimbayev M. Zh., Yusopov Kh. A., Aben E. Kh. et al. Innovation process flowsheets of hybrID geotechnologies. Problems and Prospects of Integrated Subsoil Development and Preservation : V International Conference Proceedings of Academician K. N. Trubetskoy School. Moscow : IPKON RAN, 2022. pp. 12–16.
14. Lyashenko V. I., Pukhalsky V. N. Justification of safe parameters of chambers during underground mining of pre-surface ores in faulted massifs. Mine Surveying and Subsurface Use. 2021. No. 1(111). pp. 20–32.
15. Golik V. I., Vyskrebenets A. S., Mirgaliev R. I., Mulukhov K. K., Khetagurov V. N. Directions of modernization of underground ore mining technologies. Mine Surveying and Subsurface Use. 2024. No. 5. pp. 21–25.
16. Vanneschi C., Mastrorocco G., Salvini R. Assessment of a rock pillar failure by using change detection analysis and FEM modelling. International Journal of Geo-Information. 2021. Vol. 10, Iss. 11. ID 774.
17. Rybak Y A., Khayrutdinov M. M., Kongar-Syuryun Ch. B., Tyulyayeva Yu. S. Resource-saving technologies for development of mineral deposits. Sustainable development of mountain territories. 2021. Vol. 13, No. 3. pp. 406–415.
18. Galchenko Yu. P., Trubetskoy K. N. Mining : Textbook. Moscow : Akademicheskiy proekt, 2010. 231 p.
19. Bitimbayev M. Zh., Kunayev M. S., Miletenko N. A., Alisheva Zh. N. Resourcereproducing and resource-saving metal production with a full cycle of development of primary and secondary georesources. Eurasian Mining. 2023. No. 2. pp. 36–40.
20. Feldbaum A. A. Theory of Optimal Automated Systems. Dual Control. Great Soviet Encyclopedia (30 Volumes). 3rd edition. Moscow : Sovetskaya Entciklopedia, 1972. Vol .8. 516 p.
21. Rakipov A. S. Engineering solutions to develop hard-to-reach regions of the Russian Federation. Mining Industry Journal. 2024. No. 3. pp. 22–24
22. Asano Y., Yamaguch Y., Kodama Sh. Geological mapping by thermal inertia derived from long-term maximum and minimum temperatures of ASTER data. Quarterly Journal of Engineering Geology and Hydrogeology. 2022. Vol. 56, Iss. 1. DOI: 10.1144/qjegh2022-050
23. Frantov A. Е. Blasting operations in open physicotechnical geotechnology using conversion explosives. Mine Surveying and Subsurface Use. 2012. No. 4(60). pp. 15–20.
24. Lopez-Vinielles J., Fernández-Merodo J. A, Ezquerro P. Combining satellite InSAR, slope units and finite element modeling for stability analysis in mining waste disposal areas. Remote Sensing. 2021. Vol. 13, Iss. 10. ID 2008.
25. Roy S., Bhattacharya S., Omkar S. N. Automated large-scale mapping of the Jahazpur mineralised belt by a MapReduce Model with an integrated ELM method. PFG. 2022. Vol. 90. pp. 191–209.

Полный текст статьи Physical geotechnology and geotechnical engineering toward originative subsoil use in controllable underground mining
Назад