Журналы →  Gornyi Zhurnal →  2023 →  №4 →  Назад

INDUSTRY SAFETY AND LABOUR PROTECTION
Название The Bel-Alma landslide
DOI 10.17580/gzh.2023.04.08
Автор Korobovsky N. V., Babkin E. A., Zhakanov K. K., Plaksin D. A.
Информация об авторе

Gorny Klyuch LLC, Moscow, Russia:

N. V. Korobovsky, Chairman of the Board of Directors

 

Vertex Gold Company, Bishkek, Kyrgyzstan:
E. A. Babkin, Head of Geotechnical Department, e.babkin@gam.kg
K. K. Zhakanov, Deputy Head of Geotechnical Department—Chief Geotechnical Engineer in Open Pit Mining
D. A. Plaksin, Leading Specialist in Modeling and Hydrogeology

Реферат

The article presents the monitoring data of a landslide happened under an overburden dump at the Bel-Alma coal deposit in Kyrgyzstan. The landslide took place in August 2020 during formation of the western dump 30 m high and 25 m wide. The volume of the dump by the moment of landsliding was round 100 km3. The monitoring data show that not less than 30–40 % of piled overburden rocks have crept down as a landslide for 650 m long. In 2021 the landslide monitoring included continuous visual inspection of the landslide and the dump. The situation was very complex as stripping continued and the dump grew and widened, although dumping was mostly carried out westward the landslide. The data available are used in modeling various possible scenarios, and the modeling results per different cross-sections are described. The modeling shows that the slope stability number drops to 0.921 when the modeling is added with the ground water table after long-term fallout. Thin and weakly cohesive overburden reduces the slope stability number to 0.807. The least stable site lies in the area of the landslide. The recommendations are given for the further observation of the landslide and the dumping process. In particular, it is proposed to revise the project parameters of the dumps. With a view to avoiding possible subsidence, it is required to construct a buttress at the dump bottom. Furthermore, it is required to monitor water flows and accumulations of water, and to ensure water withdrawal from the body of the landslide.

Ключевые слова Bel-Alma deposit, landslide, physical and mechanical properties, dump, monitoring, stability number, quadcopter
Библиографический список

1. Mansurov V. A., Zhakanov K. K., Ermoshkin N. N. Geotechnical prerequisites for safe and efficient accessing and mining of thick coal seam in highlands. Gornyi Zhurnal. 2021. No. 1. pp. 107–111. DOI: 10.17580/gzh.2021.01.18
2. Methodical regulations for observation of edge, slope and dump deformations, interpretation of their results and stability forecast. Leningrad, 1987. 118 p.
3. Popov V. N., Shpakov P. S., Yunakov Yu. L. Pitwall slope stability control : Textbook. Moscow : Gornaya kniga, 2008. 683 p.
4. Fomenko I. K., Pendin V. V., Gorobtsov D. N. Pit wall stability analysis for hard rocks. Gornye nauki i tekhnologii. 2016. No. 3. pp. 10–21.
5. Kadyralieva G. A. Assessment of local slope stability at mountain roads by integrated physical and mechanical properties of soils : Dissertation of Candidate of Engineering Sciences. Bishkek, 2019. 167 p.
6. Hoek E. Fundamentals of slope design : Keynote address at Slope Stability 2009. Santiago, 2009. 26 p.
7. Hoek E., Brown E. T. The Hoek–Brown failure criterion and GSI–2018 edition. Journal of Rock Mechanics and Geotechnical Engineering. 2019. Vol. 11, No. 3. pp. 445–463.
8. Babaev S. N. Monitoring technology surface mining with unmanned aerial vehicles. Interekspo Geo-Sibir. 2013. Vol. 1, No. 3. pp. 151–154.
9. King E. Aerial Drones in Mineral Exploration. 2019. Available at: https://www.geologyforinvestors.com/aerial-drones-in-mineral-exploration/ (accessed: 15.12.2022).
10. Szentpéteri K., Setiawan T., Ismanto A. Drones (UAVs) in mining and Exploration. An application example: Pit Mapping and Geological Modelling. Unconventional Exploration Target & Latest Technique and New Tools in Mineral and Coal Exploration. Bandung, 2016.
11. Read J., Stacey P. Guidelines for Open Pit Slope Design. Collingwood : CSIRO Publishing, 2009. 487 p.
12. Armstrong J., Sharon R., Williams C., Ross B. Risk-based slope monitoring framework. Slope Stability 2020 : Proceedings of the 2020 International Symposium on Slope Stability in Open Pit Mining and Civil Engineering. Perth : Australian Centre for Geomechanics, 2020. pp. 101–116.
13. Contreras L.-F., Brown E. T. Slope reliability and back analysis of failure with geotechnical parameters estimated using Bayesian inference. Journal of Rock Mechanics and Geotechnical Engineering. 2019. Vol. 11, No. 3. pp. 628–643.
14. Baecher G. B. Bayesian Thinking in Geotechnics. Proceedings of Geo-Risk 2017. Reston : American Society of Civil Engineers, 2017.
15. Pendin V. V., Fomenko I. K., Gorobtsov D. N., Nikulina M. E. Integrated modeling of waste dump slope stability. Gornyi Zhurnal. 2018. No. 11. pp. 92–96. DOI: 10.17580/gzh.2018.11.17
16. Yarg L. A., Fomenko I. K., Zhitinskaya O. M. Evaluation of slope optimization factors for long-term operating open pit mines (in terms of the Stoilensky iron ore deposit of the Kursk Magnetic Anomaly). Gornyi Zhurnal. 2018. No. 11. pp. 76–81. DOI: 10.17580/gzh.2018.11.14

Language of full-text русский
Полный текст статьи Получить
Назад