Журналы →  Gornyi Zhurnal →  2014 →  №7 →  Назад

FROM THE OPERATIONAL EXPERIENCE OF THE MINING COMPANIES AND THE ORGANIZATION
UCHALINSKY MINING AND PROCESSING INTEGRATED WORKS OJSC
Название Mining-technical recultivation of Uchaly open pit, using dehydrated concentration tailings
Автор Akhmediyanov I. Kh., Grigorev V. V., Krasavin V. P., Danilov O. N., Kalmykov V. N.
Информация об авторе

Uchalinsky Mining and Processing Integrated Works JSC (Uchaly, Russia):

Akhmediyanov I. Kh., Technical Director, Candidate of Engineering Sciences, e-mail: upr_akhmedjyanov_ih@ugok.ru

Krasavin V. P., Deputy Technical Director for Mining
Danilov O. N., Head of Department for Environmental Protection and Waterworks


LLC «Shakhtostroitelnoe upravlenie» (Mezhozerniy, Russia):
Grigorev V. V., Executive Officer, Candidate of Engineering Sciences

 

Magnitogorsk State Technical University (Magnitogorsk, Russia):
Kalmykov V. N., Professor, Doctor of Engineering Sciences

Реферат

Since the capacity of the existing tailing pond of the Uchalinsky Mining and Processing Integrated Works has been depleted, the problem of finding new sites for tailings storage in the industrially developed region is solved by way of using the stripped area of the Uchalinsky open-pit mine scheduled for completion in 2015. The huge stripped area (150 million m3) offers a room for tailings storage for a long term (40 years) and simultaneously allows addressing issues of land reclamation. Analysis of the prevailing mine-technical situation and the lack of experience gained in tailings stockpiling in combination with underground mining operations showed impossibility of tailings storage in the stripped area of the open-pit mine without pre-thickening in view of the numerous hydraulic connections between the open-pit and underground mines and due to high permeability of the tailings. Aimed at finding optimum parameters of the artificial mass made of tailings placed in the bowl of the open-pit, physico-mechanical properties of slurry were studied, namely, porosity modulus of deformation, internal friction angle, viscosity, spreading and their relationship with the basic influencing factors that allow estimation of such properties of the tailings mass as its moisture content, density, deformation and water loss. On this basis, the following design solutions have been developed:
—construction of a protective pillar 109 m thick to prevent the thickened product from entering underground roadways;
—generation of a drainage system including underground water drainage, water discharge holes and filtering screen;
—construction of watertight partitions to seal off underground roadways.
The use of the stripped area of the open-pit mine allows pruning payment for waste emplacement by 44 RUB/t and saves 274 MRUB/yr.

Ключевые слова Tailings, tailings storage, open-pit mine, stripped area, underground mining, slurry thickening, artificial mass formation, water drainage, slurry- and hydro-protection structures, economical and ecological efficiency
Библиографический список

1. Kalmykov V. N., Zoteev O. V., Zubkov An. A., Gogotin A. A., Zubkov A. A. Vestnik Magnitogorskogo gosudarstvennogo tekhnicheskogo universiteta imeni G. I. Nosova — Bulletin of Magnitogorsk State Technical University named after G. I. Nosov, 2013, No. 1, pp. 11–19.
2. Grigorev V. V. Obosnovanie sistem razrabotki pribortovykh zapasov mednokolchedannykh mestorozhdeniy pri proektirovanii kombinirovannoy geotekhnologii : dissertatsiya … kandidata tekhnicheskikh nauk (Substantiation of systems of development of near-edge reserves of copper-sulphide deposits in the time of designing of combined geotechnology : dissertation … of Candidate of Engineering Sciences). Magnitogorsk : Magnitogorsk State Technical University, 2010, 164 p
2. Available at: http://base.consultant.ru/cons/cgi/online.cgi?req=doc;base=EXP;n=398923
3. Pravila okhrany sooruzheniy i prirodnykh obektov ot vrednogo vliyaniya podzemnykh gornykh rabot pri razrabotke mednorudnykh mestorozhdeniy Urala (Regulations of protection of buildings and natural objects from harmful influence of underground mining in the time of development of Ural underground deposits). Moscow : Ministry of Non-Ferrous Metallurgy of USSR, 1978.
4. Shadrin A. G. Teoriya i raschet sdvizheniy gornykh porod i zemnoy poverkhnosti (Theory and calculation of movements of rocks and Earth surface). Krasnoyarsk : Publishing House of Krasnoysrsk University, 1990, 200 p.
5. Pravila okhrany sooruzheniy i prirodnykh obektov ot vrednogo vliyaniya podzemnykh razrabotok na mestorozhdeniyakh rud chernykh metallov Urala i Kazakhstana (Regulations of protection of buildings and natural objects from harmful influence of underground mining on Ural and Kazakhstan ferrous metal ore deposits). Sverdlovsk : Institute of Mining of Minitry of Ferrous Metallurgy of USSR, 1990.
6. Kalmykov E. P. Borba s vnezapnymi proryvami vody v gornye vyrabotki (Struggle with sudden water breakthroughs into excavations). Moscow : Nedra, 1973, 240 p.

Полный текст статьи Mining-technical recultivation of Uchaly open pit, using dehydrated concentration tailings
Назад