BENEFICIATION TECNOLOGY | |
Название | Estimation of basic mining-geological factors in the time of joint open-cast-underground mining of coal series |
Автор | Pleskunov V. N., Shvab R. G., Pleskunov I. V. |
Информация об авторе | «Belgorkhimprom» JSC (Minsk, Republic of Belarus): Pleskunov V. N., Deputy Chief Engineer, Candidate of Engineering Sciences, e-mail: pleskunov1953@mail.ru Shvab R. G., Head of Scientific-Research mine department, e-mail: nigo@inbox.ru «IEEC» LLC (Moscow, Russia): Pleskunov I. V., Head of Mining Projects, e-mail: pleskunov@imcgroup.ru |
Реферат | Feasibility studies, calculation and assessment of complex of basic mining-geological factors were carried out by example of He-Chan layer deposit (Vietnam). These factors define the possibility and conditions of joint open-cast-underground development of coal series. Hazardous influence of open pit on underground mine has the following main factors:seismic influence of single blasts (to 40 t of explosives) on excavations; turning of open pit into large water reservoir in the period of monsoonal rainfalls, threatening with mine flooding. It is necessary to carry out the researches and calculations (analogue to the ones, given in the article) to each characteristic site of deposit for the purpose of designing and practical observance of hard calendar plan (schedule) of development of open-cast and underground mining. |
Ключевые слова | Coal series, open pit, mine, interinfluence of open-cast and underground mining operations, seismic survey of explosions, water inflows, underworked massif, movement and subsidence of surface, period of harmful deformations, advanced underground mining |
Библиографический список | 1. Pleskunov I. V., Travin A. V. Kompleksnaya otsenka osnovnykh gorno-geologicheskikh faktorov pri sovmestnoy otrabotke svity plastov otkrytym i podzemnym sposobom na primere mestorozhdeniya Khe-Cham (Sotsialisticheskaya Respublika Vetnam) : Materialy mezhdunarodnoy konferentsii «Peredovye sposoby razrabotki dlya ustoychivogo razvitiya» (Complex assessment of basic mining-geological factors in the time of joint working out of layers' series by open-cast and underground mining by the example of He-Cham deposit (Socialist Republic of Vietnam):Materials of International conference «Leading engineering methods for sustainable development»). Ha Long, 2010, pp. 600–608. |
Полный текст статьи | Estimation of basic mining-geological factors in the time of joint open-cast-underground mining of coal series |