FROM THE OPERATIONAL EXPERIENCE OF THE MINING COMPANIES AND THE ORGANIZATIONS | |
To the 30-th anniversary of Taimyr mine | |
Название | Geomechanical situation during the cutting at «Bolshoy Gorst» pool (Taimyr mine) |
Автор | Galaov R. B., Kholichev E. A., Nagovitsyn Yu. N., Andreev A. A., Mulev S. N. |
Информация об авторе | Polar Division of «Norilsk Nickel» MMC (Norilsk, Russia): Galaov R. B., Head of Mining and Geological Board, phone: +7 (3919) 40-61-10
Research Institute of Mining Geomechanics and Mine Surveying — Intersectoral Scientific Center «VNIMI» (Saint Petersburg, Russia): Andreev A. A., Head of Norilsk Sector
This scientific work was held with a participation of M. P. Sergunin, Head of the Department of Geodynamic Safety Centre; L. V. Kakoshina, Head of the Geodynamic Safety Centre and E. N. Mizonov, Head of the Department of Mining and Geological Board. |
Реферат | This paper presents the results of estimation of stressedly-deformed state, seismic activity and stability of mine openings during the cutting and development at «Bolshoy Gorst» pool of Taimyr mine. The necessity of comprehensive monitoring was caused by extremely difficult mining and geological development conditions. These activities made it possible to carry out the opportune correction of approved technical solutions, including the following stages: |
Ключевые слова | Ore deposits, rock pressure, tectonically stressed zones, stresses, deformations, seismicity |
Библиографический список | 1. Metodicheskie ukazaniya po upravleniyu gornym davleniem pri sploshnykh sistemakh razrabotki s tverdeyushchey zakladkoy na rudnikakh Norilskogo Gorno-metallurgicheskogo Kombinata (Instructional guidelines on the development of rock pressure during the longwall advancing with solid stowing at the mines of Norilsk MMC). Leningrad, 1987, 126 p. |
Language of full-text | русский |
Полный текст статьи | Получить |