Журналы →  Gornyi Zhurnal →  2012 →  №1 →  Назад

GEOMECHANICAL INVESTIGATIONS
Название The decision of geomechanical problems of stability of workings on mines of Donskoy GOK
Автор Bolikov V. E., Balek А. Ye., Bekeev M. M.
Информация об авторе

Institute of Mining of the Ural Branch of the Russian Academy of Sciences:

V. E. Bolikov, Head of the Laboratory of Geomechanics and Underground Constructions, Doctor of Engineering Sciences, e-mail: bolikov@igduran.ru

А. Ye. Balek, Leading Researcher, Doctor of Engineering Sciences

 

OJSC “Donskoy GOK”:

M. M. Bekeev, Technical Director

Реферат

The analysis of the basic geomechanical problems on mines “Molodeznaya” (“Youth”) and “10-letya nezavisimosty Kazahstana” (“The 10th anniversary of independence of Kazakhstan”) of Donskoy GOK has allowed to establish that the key reason of instability of workings consists contemporary tectonic movements.

By the results of the geomechanical in-city researches, executed by Mining Institute of Urals Division of the Russian Academy of Sciences on these mines during 1980–2011, tectonic components of horizontal stresses are revealed: σ1 = –10 МPа; σ2 = –14 МPа. The horizontal azimuth σ2 at the mine “10-letya nezavisimosty Kazahstana” is about 50°, at the mine “Molodeznaya” is about 0°. Thereby the tectonic stresses on the depth above 500-660 m on the deformation bases 10–20 m serpentine rock massif goes to “post-peak” stress-strain condition. The condition causes sharp growth of stresses in the lining of mining shafts. Increments of relative deformations of rock massif, that were revealed with GPS method on the mines during 15 years on the deformation bases 300–3000 m, have reached 0,85 mm/m. It is 30–50 % of static deformations. Periodic tectonic deformations with amplitudes to 0,1 mm/m and with periods 1,5–2 hours were revealed on the deformation bases 60–200 m. Earlier at designing the given factors weren’t considered.

On the basis of the revealed laws some technical decisions for stability of workings have been worked out. The decisions: a choice of a site and trace of developments; restriction of mobility of rock blocks by advanced bolting; decrease of stresses in the lining of mining shafts by making possibility of backing the permanent lining from the shaft bottom and by yielding of back side of lining.

Ключевые слова Tectonic faults, jointing rock mass, stressed-deformed state, mining headings, chambers, mine shafts, timbering, geomechanic investigations, location measurements, GPS-geodesy
Библиографический список

1. Bolikov V. Ye., Balek A. Ye., Bierkovich V. H. Izvestiya vuzov. Gornyi zhurnal. — Mining Journal. News of Higher School, 1997, No. 3-4, pp. 36–48.

2. Yedilbajev I. B. Vozrozhdenje (Revival). Almaty, 2004. 276 p.

3. Bolikov V. E., Balek A. Ye., Til V. V. Gornyi zhurnal — Mining Journal,1998, No. 6, pp. 15–17.

4. Sashurin A. D., Bolikov V.E., Balek A.Ye. Gornyi zhurnal — Mining Journal, 2005, No. 12, pp. 102 – 107.

5. Bolikov V. E., Balek A. Ye. Gornyi vestnik. — Mining Bulletin, 1995, No. 4, p. 45–48.

6. Shuplecov Ju. P. Prochnost deformiruemost skalnyh massivov (Durability and deformability of rocky massifs). Ekaterinburg, 2003, 195 p.

7. Sashurin A. D. Materialy chetvertoyi mezhdunarodnoyi nauchno-prakticheskoyi konferencii “Problemy i puti ustoyichivogo razvitiya gornodobyvajuszhih otrasley promyshlennosti” (Materials of 4th International Science and Practical Conference “Problems and ways of a sustainable development of mining industries”). Khromtau, 2007, pp. 220–223.

8. Balek A. Ye. Izvestiya vuzov. Gornyi zhurnal. Seriya: Gornoyie delo — News of Higher School. Mining Journal Series: Mining Matter, 2000, No. 11, pp. 209–214.

9. Bolikov V. E., Balek A. Ye. Izvestiya vuzov. Gornyi zhurnal — News of Higher School. Mining Journal, 2010, No. 7, pp. 39–45.

Language of full-text русский
Полный текст статьи Получить
Назад