Журналы →  Tsvetnye Metally →  2019 →  №8 →  Назад

90th Anniversary of the Institute “Uralmekhanobr”
Название Capability for metallurgical processing of Intermediate products for the processing of polymetallic ores
DOI 10.17580/tsm.2019.08.09
Автор Bulatov K. V., Kharitidi G. P., Zakirnichnyi V. N., Skopov G. V.
Информация об авторе

Uralmekhanobr, Yekaterinburg, Russia:

K. V. Bulatov, Scientific Аdvisor
G. P. Kharitidi, Adviser to General Director, e-mail: kharitidi_gp@umbr.ru
V. N. Zakirnichnyi, Deputy General Director for Research, e-mail: Zakirnichnyy_vn@umbr.ru

 

UMMC-Holding, Verkhnaya Pyshma, Russia:
G. V. Skopov, Principal Specialist at Strategic Planning Department

Реферат

The copper smelting facilities of the Ural Mining and Metallurgical Company (UMMC) mostly rely on copper-zinc and polymetallic ores. Finely disseminated minerals are associated with increased cost of selective flotation and mineral losses with dissimilar concentrates. In selective flotation of copper-zinc ores from the Urals region, between 6% (high zinc ores) and 23–44% of zinc get lost with copper concentrates depending on metal concentration and intergrowth of minerals in the ore, with the concentration of zinc in it being less than 1 %. In metallurgical processing, 90–95% of zinc contained in copper concentrates go to waste with the slag. Processing of polymetallic ores from the Altay deposits is associated with high losses of copper, lead and zinc, which get lost with dissimilar concentrates. The authors of this paper propose to obtain bulk concentrates from low zinc (0.4–1% Zn) and highly complex copper-zinc ores; obtain high-quality zinc and polymetallic (copper-lead-zinc) concentrates from polymetallic ores; set up a processing facility for polymetallic concentrates at the Mednogorsk Copper-Sulphur Plant (MCSP) that would involve the following stages: matte and zinc slag smelting – matte converted to blister copper – copper extraction from and fuming of smelter and converter slags. The main smelting vessel is currently under reconstruction aimed at introducing high-pressure highly concentrated blast oxygen; a slag fuming complex will need to be built with gas scrubbers to produce lead-zinc sublimates. An existing oxygen plant is utilised, and all sulphur containing gases are treated in a sulphuric acid facility present at the site. The advantages of the proposed processing scheme include: increased end-to-end recovery (from complex ores to refined ingots): copper — by 2.7%, zinc — by 8.1%; the output of refined lead at UMMC increased by 14 th tons with no special investment made; simpler processing schemes and a significant reduction in processing and transportation costs; rational use of the MCSP production facilities and infrastructure, raw materials available on a stable and long-term basis; an increase of 3.8 bln rubles per annum in the commodity output of UMMC.

Ключевые слова Complex ores, selective flotation, bulk flotation, concentrates, middlings, metallurgical processing
Библиографический список

1. Swayn G. P., Mounsey E. N. Ausmelt Technology Versatility: The desing and operation of the Ausmelt lead smelter and the subsequent development of the unit to successfully produce copper matte at Tsumeb Smelter, Namibia. GDMB Conference 58th Meeting of the Copper Committee. Alpbach, Austria, September 24–25. 1998.
2. Choi C. Y., Lee Y. H. Treatment of zinc residues by Ausmelt technology at Onsan zinc refinery. Global Symposium on Recycling. Waste Treatment and Clean Technology. San Sebastian, Spain, 5th–9th September 1999.
3. Greedy S., Glinin A., Matusewicz R., Hughes S., Reuter M. Ausmelt technology for treating zinc residues. World of Metallurgy – ERZMETALL. 2013. Vol. 66, Iss. 4. pp. 230–235.
4. RämäM., Nurmi S., Jokilaakso A., Klemettinen L., Taskinen P., Salminen J. Thermal Processing of Jarosite Leach Residue for a Safe Disposable Slag and Valuable Metals Recovery. Metals. 2018. Vol. 8, Iss. 10. p. 744.
5. Swayn G. P., Robilliard K. R., Floyd J. M. Applying Ausmelt processing to complex copper smelter dusts. JOM: The Journal of the Minerals, Metals and Materials Society. 1993. Vol. 45, Iss. 8. pp. 35–38.
6. Prajsnar R., Czernecki J. Recovery of zinc, lead and copper from waste multi-phase slags in oxidation-reduction smelting process in the pilot TSL furnace. World of Metallurgy – ERZMETALL. 2015. Vol. 68, Iss. 5. pp. 271–277.
7. Bulatov K. V., Skopov G. V., Kharitidi G. P. et al. Polymetallic concentrate processing practices at MCSP. Current trends in the theory and practice of minerals and man-made materials processing: Proceedings of the international conference. Yekaterinburg, 5–7 November 2014. Yekaterinburg : Izdatelstvo UNTs UPI. pp. 170–176.
8. Bulatov K. V., Skopov G. V., Skopin D. Yu., Yakornov S. A. Processing of polymetallic concentrates in melting facility “Pobeda” (LLC “Mednogorsk copper-sulfur combine”). Tsvetnye Metally. 2014. No. 10. pp. 39–44.
9. Skopov G. V., Starkov K. E., Kharitidi G. P., Yakornov S. A., Bulatov K. V. Processing of sulphide copper-lead-zinc materials. Patent RF, No. 2520292. Applied: 06.12.2012. Published: 20.06.2014. Bulletin No. 17.
10. Yakornov S. A., Bulatov K. V., Skopin D. Yu. et al. Metallurgical furnace wall liners. Patent EA, No. 029948. Applied: 10.12.2014. Published: 29.06.2018. Bulletin No. 6.
11. Grechko A. V., Besser A. D., Kalnin E. I. Modern practices of dump slag fuming. Tsvetnaya metallurgiya. 2000. No. 11–12. pp. 28–32.
12. Eliseev I. S., Babadzhan A. A. Processing of copper-zinc middlings. Tsvetnye Metally. 1974. No. 3. pp. 3–8.

Language of full-text русский