Журналы →  Gornyi Zhurnal →  2017 →  №9 →  Назад

FROM THE OPERATIONAL EXPERIENCE OF THE MINING COMPANIES AND THE ORGANIZATIONS
UGC Gold Mining Company
Название Improvement of underground mining technology at Kochkar deposit
DOI 10.17580/gzh.2017.09.04
Автор Strukov K. I.
Информация об авторе

UGC Management Company, Chelyabinsk, Russia:

K. I. Strukov, Founder and President, Candidate of Engineering Sciences, information@ugold.ru

Реферат

The article presents the main trends of improvement of underground mining technology, ensuring considerable growth of production output and productivity of labor, as well as cost saving. These trends include transition to open stoping, replacement of portable equipment by self-propelled heavy-duty machines of high unit capacity, development of crushed veins and non-profitable ore reserves at the depleted upper horizons and under the town of Plast, withdrawal of the conventional descending method for the benefit of the ascending mining system. The possibility of earlier mined-out tunnels at the upper levels to be used for preparation and development of new blocks is illustrated. The implementation of the technology improvements allows an increase in production output to 4–5 Mt yearly, higher productivity of labor by 2–3 times, cost saving by 1.5 times and reduction in land withdrawal for tailings storage.

Ключевые слова Ore lodes, mineralization zones, self-propelled equipment, stoping, ascending mining, tailings, backfilling
Библиографический список

1. Available at: http://docs.cntd.ru/document/499086982 (accessed: 15.04.2017).
2. Regulations for safe mining at the rock bump liable deposit (Kochkarskoe gold ore deposit, JSC «Yuzhuralzoloto»). Magnitogorsk, 2014. 63 p.
3. Aynbinder I. I. Improvement of deep-level ore mining. Gornyi Zhurnal. 2016. No. 12. pp. 51–55. DOI: 10.17580/gzh.2016.12.11
4. Liu J., Liu C., Corranza E. J. M., Li Y., Mao Z. et al. Geological characteristics and ore-forming process of the gold deposits in the western Qinling region, China. Journal of Asian Earth Sciences. 2015. Vol. 103. pp. 40–69.
5. Kalmykov V. N., Slashchilin I. T., Suraev V. S., Strukov K. I. Experience and prospects of mining of complex-structured veins of Kochkarskoe gold ore deposit. Gornyy informatsionno-analiticheskiy byulleten. 2000. No. 11. pp. 87–89.
6. Berger R. V., Kazilov P. V., Kalmykov V. N., Kulsaitov R. V., Gogotin A. A. About the possibility of involvement of prospecting sites of Kochkarskoe gold ore deposit in redevelopment. Combined geotechnology: stable and ecologically balanced mastering of soils : materials of International scientific-technical conference. Magnitogorsk : MGTU, 2015. pp. 116–117.
7. V. I. Borshch-Komponiets, A. B. Makarov, V. S. Myakishev, E. V. Faydel, V. G. Yakovenko. Method of remining. Patent USSR 1454970. Applied: 25.03.87. Published: 30.01.89. Bulletin No. 4.
8. Cavalcante P. R. B., Palkovits F. Paste fill – a safety solution for pillar mining. Past 2013: proceedings of the 16th International Seminar on Paste and Thickened Tailings. Perth : Australian Centre for Geomechanics, 2013. pp. 443–456.
9. Thrybom L., Neander J., Hansen E., Landemas K. Future Challenges of Positioning in Underground Mines. IFAC-PapersOnLine. 2015. Vol. 48, Iss. 10. pp. 222–226.
10. Hammer F., Pichler M., Fenzl H., Gebhard A., Hesch C. An acoustic position estimation prototype system for underground mining safety. Applied Acoustics. 2015. Vol. 92. pp. 61–74.
11. Gogotin A. A., Kulsaitov R. V., Islamov A. Z. Substantiation of structural components of mining systems during the secondary mastering of Kochkarskoe gold ore deposit with application of existing excavations. Problems and prospects of complex mastering of soils and saving of Earth soils : materials of International scientific-technical conference. Moscow : IPKON RAN, 2014. pp. 194–197.
12. Kalmykov V. N., Kulsaitov R. V. Development of reopening technology for vein gold ore deposits (on the example of the higher levels of Kochkarskoe deposit). Problems and prospects of complex mastering and saving of Earth soils : collection of proceedings of conference. Moscow : IPKON RAN, 2016. pp. 208–211.
13. Kalmykov V. N., Strukov K. I., Konstantinov G. P., Kulsaitov R. V. Developing a reworking process for the upper levels of the Kochkarskoye gold mine. Vestnik Magnitogorskogo gosudarstvennogo tekhnicheskogo universiteta imeni G. I. Nosova. 2016. Vol. 4, No. 3. pp. 13–20.
14. Kaplunov D. R. Development of production capacity of underground mines during the technical re-equipment. Moscow : Nauka, 1989. 263 p. ISBN 5-02-005912-9
15. Vetrov S. V. Permissable rate of rocks opening during the underground ores mining. Moscow : Nauka, 1975. 232 p.
16. Zienkiewicz O. C., Taylor R. L., Zhu J. Z. The Finite Element Method: Its Basis and Fundamentals. 7th еd. Butterworth-Heinemann, 2013. 756 p.
17. Meshcheryakov E. Yu., Valeev A. S., Allaberdin A. B. Rationale for parameters of a combined filling mass in ascending exploitation mining. Vestnik Magnitogorskogo gosudarstvennogo tekhnicheskogo universiteta imeni G. I. Nosova. 2014. No. 4. pp. 10–13.

Полный текст статьи Improvement of underground mining technology at Kochkar deposit
Назад