Журналы →  Gornyi Zhurnal →  2013 →  №10 →  Назад

DEVELOPMENT OF DEPOSITS
Название Experience of excavation supports on Australian and Canadian underground mines in severe-strain enclosing massifs
Автор Sandy М. Р., Lushnikov V. N., Eremenko V. A.
Информация об авторе

Australian Mining Consultants Pty Ltd. (Perth, Australia):

Sandy М. Р., Executive Officer, e-mail: msandy@amcconsultants.com

Lushnikov V. N., Leading Mining Engineer


Institute of Comprehensive Exploration of Mineral Resources of Russian Academy of Sciences (Moscow, Russia):

Eremenko V. A., Leading Researcher, Doctor of Engineering Sciences

 

Geobrugg Company (Perth, Australia):

Bucher R., Chief Executive Officer

Реферат

Important characteristic of support in severe-strain medium is its functional capacity for spring and compliance, saving the holding capacity at the same time. Understanding of support deformation mechanisms with improvement in the process of interaction of rock mass and support elements is the necessary part of designing of reinforcing systems, which make it possible to increase the efficiency and provide the safety of mining operations. There are shown the basic support deformation mechanisms, observed on the mines, developed in massifs of layer rocks with high inclination to deformation. Monitoring of shear strains helps to understand the mechanism of influence on functional capacities of anchors. Obtained data were used for laboratory testings and during the projecting of shear-resistant supports. Experience of extraction maintenance on Australian and Canadian mines at great depths is presented in this article together with technical and technological measures for the choice of support and strengthening systems for specific conditions. Mechanisms of control of deformations of enclosing excavation massif are considered from the point of designing and choice of supports. The possibilities of mine monitoring are also considered in this article.

Ключевые слова Mine excavation, support, drift, anchor, layer rocks, replacement, deformation, fissuring, dilatation, stresses
Библиографический список

1. Sandy M. P., Player J. R. Reinforcement design investigations at Big Bell. Rock Support and Reinforcement Practice in Mining. Editors: E. Villaescusa, C. R. Windsor and A. G. Thompson. Balkema, Rotterdam, 1999, pp. 301–315.
2. Lee M. F., Bridges M. C. Rock mechanics of crown pillars between cut-and-fill stopes at Mount Isa Mine. Applications of Rock Mechanics to Cut and Fill Mining. Editors: Stephansonn and Jones. Institution of Mining and Metallurgy. London, 1981, pp. 316–329.
3. Beck D. A., Sandy M. P. Mine sequencing for high recovery in Western Australian mines. AusIMM Bulletin, 2003, No. 3, pp. 38–46.
4. Lee M. F., Mikula, P., Pascoe M. J. Virgin rock stresses vs rock mass strength in Western Australia's Yilgarn greenstones. Ground Control in Mines Workshop. The Chamber of Minerals and Energy. Perth, June 2001.
5. Simser B., Andrieux P., Mercier-Langevin F., Parrott T., Turcotte, P. Field behaviour and failure modes of modified conebolts at the Craig, LaRonde and Brunswick mines in Canada. Proceedings of the 3rd International Seminar on Deep and High Stress Mining, 2–4 October 2006, Quebec, Canada. Quebec, 2006.
6. Guilfoyle K., Slade N., Kenworthy S. The N3500 project – deep, high stress and talc. Proceedings of the 3rd International Seminar on Deep and High Stress Mining, 2–4 October 2006, Quebec, Canada. Quebec, 2006.
7. Eremenko V. A., Razumov E. A., Zayatdinov D. F. Gornyy Informatsionno-Analiticheskiy Byulleten — Mining Informational and Analytical Bulletin, 2012, No. 12, pp. 38–45.
8. Mercier-Langevin F., Turcotte P. Evolution of support practices at Agnico-Eagle’s LaRonde Division — innovative solutions to high stress yielding ground. Proceedings of the 1st Canada- US Rock Mechanics Symposium, Vancouver, Canada. Vancouver, 2007, pp. 1497–1504.
9. Eremenko V. A., Lushnikov V. N., Sendi M. P., Milkin D. A., Milshin E. A. Gornyi Zhurnal — Mining Journal, 2013, No. 7, pp. 59–66.
10. Louchnikov V., Brown S., Bucher R. Mechanized installation of high-tensile chain-link mesh in underground operations. Proceedings of the 11th AusIMM Underground Operators Conference, March 21-23, 2011, Canberra, Australia. Canberra, 2011, pp. 40–60.

Language of full-text русский
Полный текст статьи Получить
Назад